Landscaping Improvement, Rajjaprabha Dam
Additional works such as service road for the golf course, area improvement and road expansion for the multipurpose buiding, drainage system were complected.

Area Extension Work, Ayudhaya Substation 1

The work has been completed since August 2006.

Area Extension Work, Pluak-Daeng Substation, Rayong Province

The duration of work is 120 days with a budget of MB.7.583; work was completed.

Area Extension Work, Songkla 2 Substation, Songkla Province

The duration of work is 60 days with a budget of MB.6.533.

Area Extension Work, Angthong Substation 1

The duration of work is 150 days (August 15, 2005 - January 2006) with a budget of MB.9.6.

Improvement of Reservoir and Pumping System, Bangpakong Power Plant
With the budget of MB 45.705, works comprise jet grouting work, concrete pouring, soil excavation for pipe lining.

Area Extension Work, Ayudhaya Substation 2

The duration of work is 120 days with a budget of MB.5.920.

Area Extension Work, Rayong Substation, Rayong Province

The duration of work is 90 days with a budget of THB.750,111.

Construction of Royal Residence, Sirikit Dam
A budget of MB 21.836 is allocated to the royal residence construction at Sirikit Dam. The project comprises foundation work, reinforced concrete structure, finishing work, sanitary work, lighting system, painting work and landscaping.

Area Preparation Work for Songkla Power Plant
Works comprise earthfill work for power plant, switchyard, and cooling tower, road construction around the power plant area, north diversion canal construction and canal dredging.

Road Improvement, Kuan Hua Chang Village, Songkla Province
Works comprise road improvement: 1st stage for 1.5 kilometres (1.992 MB) and 2nd stage for 3.5 kilometres (4.72 MB).
Construction of Suspension Bridge, Sirikit Dam
In commemoration of the sixth cycle birthday anniversary of the Queen Sirikit, Sirikit Dam has budgeted MB. 18.597 for construction the suspension bridge which is 1.60 m. in width, 160 m. in width across the Nan River and its total length is 220 m.

Area Improvement, Kanchanaburi Substation 2
The duration of work is 120 official days with a budget of MB 9.370.

Chiang Mai Highlands Golf Club

Mon Phya Prom Co.,Ltd. has employed EGAT, Hydro Power Construction Division with a budget of 37.068 MB. to improve area and construct the main road for the golf course. Duration of work was between May 2004 to August 2005.

Wang Noi Thermal Power Plant Area Improvement
Construction work at Wang Noi Thermal Power Plant comprises sludge cake, multi-purpose area for fitness park, toilet, water supply system, car park building, road improvement, and additional crane rail at Chlorineblock 1,2,3.
Construction of Downstream Drainage System, Vajiralongkorn Dam
Work comprises excavation work, intake, tailrace, drainage pipe and landscaping and it was performed during Feb.-Sept. 2004.
Area Improvement and Construction of Drainage System for Substation
HPCD offered a service for Transmission System Extension Project No.10 to improve area and construct the drainage system in various sites: Surin 2 Substation, Roi Et 2 Substation, Nakhonchaisi Substation and Yasothon Substation. The total project cost was 39.045 MB.
Improvement of Bang Poo Dum Reservoir Embankment, Krabi Province
Works comprise reservoir embankment construction, intake structure and drainage work for spillway.